Skip to content

Project Meeting 2019.12.20

Ben Stabler edited this page Dec 18, 2019 · 27 revisions

Project management

  • Reviewed ARC's PRs and accepted with a note about increasing test coverage
  • @Ben discuss test coverage in more detail (and schedule a follow-up call if needed)

Task 4 I/O Improvements

  • @Blake just about done with input reader and write a simple travel survey database output improvements
  • @Jeff and @Ben discussed adding the ability to get the logsum when a choice is a made; @Ben drafting spec

Task 5 TNC

  • @Ben reviewed DaySim and CT-RAMP TM1.5 setups and preparing draft spec to discuss

Task 8 PopSim Integration

  • Done - repo transferred to ActivitySim, all docs and websites updated, better separated ODOT products from PopSim products, posted package to pypi
Clone this wiki locally