How to achieve predicted output of new energy units in Andes simulation? #524
Unanswered
Crazy-Bike
asked this question in
Q&A
Replies: 1 comment
-
I assume you are talking about the fluctuated wind power generation. In ANDES documentation, following groups are designed for such functionality: RenGovernor, RenPitch, RenPlant, and RenTorque. Additionally, the following book can be a good reference for more details of these models:
A similar frequency regulation study is given in AMS documentation, where the random load fluctuation is achieved by changing load every second: https://ltb.readthedocs.io/projects/ams/en/latest/_examples/demo/demo_AGC.html |
Beta Was this translation helpful? Give feedback.
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
-
Hello, may I ask how to achieve the given output of new energy units in Andes? For example, given the predicted output of a wind turbine, how can the wind turbine output be controlled and determined during the simulation process? I want to achieve the construction of new energy output penetration rate through this method, rather than the installed capacity penetration rate of new energy.
Thank you very much!