Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Ultrafast High Temperature Sintering Phase 1 #77

Open
bernardusrendy opened this issue Mar 7, 2024 · 1 comment
Open

Ultrafast High Temperature Sintering Phase 1 #77

bernardusrendy opened this issue Mar 7, 2024 · 1 comment
Assignees
Labels
feature request new feature to implement
Milestone

Comments

@bernardusrendy
Copy link
Collaborator

No description provided.

@bernardusrendy bernardusrendy changed the title UHS development Ultrafast High Temperature Sintering Purchasing Mar 7, 2024
@bernardusrendy bernardusrendy changed the title Ultrafast High Temperature Sintering Purchasing Ultrafast High Temperature Sintering Phase 1 Mar 7, 2024
@bernardusrendy bernardusrendy added the feature request new feature to implement label Mar 7, 2024
@bernardusrendy bernardusrendy self-assigned this Mar 7, 2024
@bernardusrendy bernardusrendy added this to the v2024.03.18 milestone Mar 7, 2024
@bernardusrendy
Copy link
Collaborator Author

bernardusrendy commented Mar 8, 2024

Purchase:

  • Power supply 1500W 60V-25A, UL listed, LAN enabled (1 week lead time ARO, GEN 60-25-LAN)
  • IR sensor (OPTCTL3MH3SF)
  • Copper based AWG12 cables with high Tc, connectors, and how to solder
  • Silicone (use the one in the lab probably) stopper or epoxies for cables to enable slight vacuum purging
  • Slightly Thick Copper bars (will be drilled), screws, nuts, hand tapping, Tapping drill, spacer
  • Welding mask
  • AC Input cable for PSU
  • Silver sheet or
  • Silver paste(check if we still have one in lab, should be enough)
  • Quick and slow fuse 20A, 10A, 15A, DIN Rail fuse container
  • Connectors for the cable in front of tube furnace
  • Adhesive DIN rails (PSU is outside)
  • Wrap the remaining quartz surface with aluminum foil to reflect infrared (protect eyes)

Check and Test:

  • Where to plugin the PSU, cable length
  • Test rubber stopper and purging

Finalize design:

  • All new installation hanging on tube furnace door

@odartsi odartsi modified the milestones: v2024.03.18, v2024.04.01 Mar 18, 2024
@odartsi odartsi modified the milestones: v2024.04.01, v2024.04.15 Apr 1, 2024
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
feature request new feature to implement
Projects
None yet
Development

No branches or pull requests

2 participants