You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The "Working with Stages" doc has detailed instructions for doing many other things Stage-related, but under "Promoting Freight to a Stage," only has a placeholder.
We should add UI-based and CLI-based instructions for this.
Consistent with the rest of the page, the UI and CLI-based instructions can be on different tabs, with the UI-based instructions selected by default.
Note that this should show the "Stage first" method of promotion -- i.e. clicking the promote button on a Stage and then picking Freight from the timeline.
I am opening a separate issue for adding "Freight first" promotion instructions to the "Working with Freight" doc. The two sections can link to one another.
The text was updated successfully, but these errors were encountered:
The "Working with Stages" doc has detailed instructions for doing many other things Stage-related, but under "Promoting Freight to a Stage," only has a placeholder.
We should add UI-based and CLI-based instructions for this.
Consistent with the rest of the page, the UI and CLI-based instructions can be on different tabs, with the UI-based instructions selected by default.
Note that this should show the "Stage first" method of promotion -- i.e. clicking the promote button on a Stage and then picking Freight from the timeline.
I am opening a separate issue for adding "Freight first" promotion instructions to the "Working with Freight" doc. The two sections can link to one another.
The text was updated successfully, but these errors were encountered: