This task should be addressed in late 2024 or early 2025.
Some of our repositories contain a NOTICE that needs to be kept up to date. A CI job that must be triggered manually takes care of this. The job works by going through a list of repositories and branches, changes the dates in the files, and pushes the changes.
Here are the steps that need to be performed for the NOTICE file update:
Create maintenance branches for any older versions of modules that you expect we will build patches from in the next year
Example: Assume we have released Spin 1.6.0, but there is no 1.6 maintenance branch yet. If we expect that may build 1.6.1 in the future, we should create the 1.6 now so that the notice file is correct
remove all maintenance branches that are out of support (see the support announcements)
remove side project branches that are not used by maintained version branches
add missing supported maintenance branches and missing side project branches (i.e. those that were released during this year, see the support announcements)
This issue was imported from JIRA:
This task should be addressed in late 2024 or early 2025.
Some of our repositories contain a NOTICE that needs to be kept up to date. A CI job that must be triggered manually takes care of this. The job works by going through a list of repositories and branches, changes the dates in the files, and pushes the changes.
Here are the steps that need to be performed for the NOTICE file update:
PushChanges
boxPushChanges
checkedLinks: