Was hoping that cancelled tasks would be left in place where I entered them, but would be ignored for the timeline. They should not be notified either.
Current behaviour
Cancelled tasks are still shown on the timeline, even if they conflict with a non-cancelled task.
Steps to reproduce
I cancelled a couple of the tasks I had plannd for today, using the [-] checkbox setting.
I then added a new Webinar task to replace the cancelled "Shop" task at the same time that "Shop" should have happened.
The timeline still shows the shop task.
Which Operating Systems are you using?
Android
iPhone/iPad
Linux
macOS
Windows
Obsidian Version
1.8.5
Plugin Version
0.6.3
Checks
I have tried it in the sandbox vault with only this plugin enabled
Possible solution
Maybe have an option and a list of checkbox settings to ignore for the timeline, similar to the "Preserve" option?
or display concurrent tasks side by side?
If I re-sequence so the "live" task is after the cancelled one then it shows the live task, and I could just delete the cancelled task, but on my work timeline I need to report on both live and cancelled the next day.
The text was updated successfully, but these errors were encountered:
Expected Behavior
Was hoping that cancelled tasks would be left in place where I entered them, but would be ignored for the timeline. They should not be notified either.
Current behaviour
Cancelled tasks are still shown on the timeline, even if they conflict with a non-cancelled task.
Steps to reproduce
I cancelled a couple of the tasks I had plannd for today, using the [-] checkbox setting.
I then added a new Webinar task to replace the cancelled "Shop" task at the same time that "Shop" should have happened.
The timeline still shows the shop task.
Which Operating Systems are you using?
Obsidian Version
1.8.5
Plugin Version
0.6.3
Checks
Possible solution
Maybe have an option and a list of checkbox settings to ignore for the timeline, similar to the "Preserve" option?
or display concurrent tasks side by side?
If I re-sequence so the "live" task is after the cancelled one then it shows the live task, and I could just delete the cancelled task, but on my work timeline I need to report on both live and cancelled the next day.
The text was updated successfully, but these errors were encountered: