[IRS][TRACE-X] 🌟🚀 Metrics Provision and Integration for IRS and Trace-X #941
Labels
ic
represents features/dependencies to the industry core
irs
Feature/Bug for Item Relationship Service component
Prep-R25.06
trace-x
Feature/Bug for Trace-x component
Overview
Explain the topic in 2 sentences
Collecting and providing IRS and Trace-X performance metrics to Prometheus where it could later be imported to e.g. Grafana to have a monitoring of the products regarding performance Metrics and KPIS.
What's the benefit?
Product provides performance metric which could be shown.
What are the Risks/Dependencies ?
Detailed explanation
The system should collect various operational metrics from IRS and Trace-X as specified, ensuring that these metrics are available through the Prometheus interface for monitoring and visualization in Grafana. These metrics should cover contract negotiation durations, twin synchronization, asset requests, and API orchestration flows, all of which are essential for the performance and reliability monitoring of the system.
Current implementation
IRS already provides metrics via Prometheus. This will be extended.
Trace-X doesn't provide metrics via Prometheus.
Proposed improvements
EDC Contract Negotiation (Duration)
Sync Duration for Sync Total Amount of Twins in DTR
EDC Asset Requesting Flow (DTR)
EDC Asset Requesting Flow (Asset)
EDC Twin Requesting Flow
Order API Orchestration Before Processing
Feature Team
Contributor
Committer
User Story
As a team,
I want to collect and provide IRS and Trace-X metrics to Prometheus
So that they can, the team could monitor key performance indicators in Grafana.
Description:
The system should collect various operational metrics from IRS and Trace-X as specified, ensuring that these metrics are available through the Prometheus interface for monitoring and visualization in Grafana. These metrics should cover contract negotiation durations, twin synchronization, asset requests, and API orchestration flows, all of which are essential for the performance and reliability monitoring of the system.
Acceptance Critieria
Test Cases
Test Case 1
Steps
Expected Result
Architectural Relevance
The following items are ensured (answer: yes) after this issue is implemented:
Justification: (Fill this out, if at least one of the checkboxes above cannot be ticked. Contact the Architecture Management Committee to get an approval for the justification)
Additional information
The text was updated successfully, but these errors were encountered: