If you are mainly interested in using CIRCT from Python scripts, you need to compile both LLVM/MLIR and CIRCT with Python bindings enabled. To do this, follow the steps in "Setting this up", adding the following options:
# in the LLVM/MLIR build directory
cmake [...] -DMLIR_BINDINGS_PYTHON_ENABLED=ON
# in the CIRCT build directory
cmake [...] -DCIRCT_BINDINGS_PYTHON_ENABLED=ON
Afterwards, use ninja check-circt-integration
to ensure that the bindings work. (This will now additionally spin up a couple of Python scripts to test that they are accessible.)
If you want to try the bindings fresh from the compiler without installation, you need to ensure Python can find the generated modules:
export PYTHONPATH="$PWD/llvm/build/python:$PWD/build/python:$PYTHONPATH"
If you are installing CIRCT through ninja install
anyway, the libraries and Python modules will be installed into the correct location automatically.
Now you are able to use the CIRCT dialects and infrastructure from a Python interpreter and script:
# silicon.py
import circt
import mlir
from mlir.ir import *
from circt.dialects import hw, comb
with Context() as ctx, Location.unknown():
circt.register_dialects(ctx)
i42 = IntegerType.get_signless(42)
m = Module.create()
with InsertionPoint(m.body):
@hw.HWModuleOp.from_py_func(i42, i42)
def magic(a, b):
return comb.XorOp(i42, [a, b]).result
print(m)
Running this script through python3 silicon.py
should print the following MLIR:
module {
hw.module @magic(%a: i42, %b: i42) -> (%result0: i42) {
%0 = comb.xor %a, %b : i42
hw.output %0 : i42
}
}