Big update in light of Lockup merger #203
Labels
effort: epic
Multi-stage task that may require multiple PRs.
priority: 1
This is important. It should be dealt with shortly.
work: complicated
Sense-analyze-respond. The relationship between cause and effect requires analysis or expertise.
In Lockup V2.0.0, we have decided to merge the LockupLinear, LockupTranched, and LockupDynamic contracts. Context here: sablier-labs/lockup#1064
Many parts of the docs will have to be updated.
The text was updated successfully, but these errors were encountered: