You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Recap Day 2, identify themes from our storyboards (30min)
Identify conflicts in our storyboards (30min)
Conflict: two or more ways of solving the same problem.
List the underlying assumptions (30min)
Create a table with two columns. One listing the assumptions embedded in our
prototype and the other listing the ways in which we can test those assumptions.
Storyboard your prototype (2hrs)
Determine prototype medium (10min)
Plan interview questions (40min)
Make plans for reducing risks not addressed by the prototype (40min)
Consider plans for the week following the design sprint (30min)