Skip to content

DEV: add release.yml #227

DEV: add release.yml

DEV: add release.yml #227

Triggered via push September 12, 2023 23:24
Status Failure
Total duration 4m 53s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.8)
Process completed with exit code 1.
test (3.9)
The job was canceled because "_3_8" failed.
test (3.9)
The operation was canceled.
test (3.10)
The job was canceled because "_3_8" failed.
test (3.10)
The operation was canceled.
test (3.11)
The job was canceled because "_3_8" failed.
test (3.11)
The operation was canceled.