test: adding integration tests #29
integration.yml
on: pull_request
matching
1m 13s
ext-lhcb_integration
1m 21s
Matrix: integration
Annotations
13 errors
integration (2.7.18, integration)
Process completed with exit code 1.
|
integration (2.7.18, rel-v8r0)
The job was canceled because "_2_7_18_integration" failed.
|
integration (2.7.18, rel-v8r0)
The operation was canceled.
|
integration (3.6.15, integration)
The job was canceled because "_2_7_18_integration" failed.
|
integration (3.6.15, integration)
Process completed with exit code 1.
|
integration (3.9.17, integration)
The job was canceled because "_2_7_18_integration" failed.
|
integration (3.9.17, integration)
The operation was canceled.
|
integration (3.9.17, rel-v8r0)
The job was canceled because "_2_7_18_integration" failed.
|
integration (3.9.17, rel-v8r0)
The operation was canceled.
|
integration (3.6.15, rel-v8r0)
The job was canceled because "_2_7_18_integration" failed.
|
integration (3.6.15, rel-v8r0)
The operation was canceled.
|
matching
Process completed with exit code 1.
|
ext-lhcb_integration
Process completed with exit code 2.
|