-
Notifications
You must be signed in to change notification settings - Fork 5
Feb. 15, 2019
David Lawrence edited this page Feb 15, 2019
·
6 revisions
Location: CC F326-327
Time: 14:30-15:30
- Description(David)
- Toy Problem (Gagik)
- Meeting time and frequency
- AOB
- We discussed the toy problem (ex_toy2).
- Both David and Gagik showed slides describing networks they trained and the resulting angular resolutions.
- David's network (MLP) resulted in a ~16 degree resolution
- Gagik's network was able to achieve 0.3 degree resolution.
- There was some discussion on the reason for the discrepancy. It was speculated that this was due to David's samples having a variation on the origin of the track whereas Gagik's sample had all tracks originating from the center. (The speculation was confirmed after the meeting).
- We discussed the next challenge. Gagik suggested fitting arcs drawn from the center. The radius of curvature (p) and phi angle can both be fit and two values extracted.
- David volunteered to set up a JLab mailing list for communications.
Next meeting: We agreed to meet about every 2 weeks. The next meeting will be on Friday Mar. 1st at 2:30pm