testing engage chp results and structure
- Loading branch information
Showing
31 changed files
with
2,456 additions
and
304 deletions.
There are no files selected for viewing
Large diffs are not rendered by default.
Oops, something went wrong.
77 changes: 77 additions & 0 deletions
77
Engage-Testing/chp_test/chp_topping_depth_1.0_prod_1.0_inj_1.0_temp_400.txt
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,77 @@ | ||
---------------------------------------------------------------------------------------- | ||
GEOPHIRES v2.0 Input File | ||
---------------------------------------------------------------------------------------- | ||
***Subsurface technical parameters*** | ||
************************************* | ||
Reservoir Model,3, ---m/A Single Fracture Thermal Drawdown | ||
Drawdown Parameter,.00002, ---[kg/s/m2] | ||
Reservoir Depth,1.0, ---[km] | ||
Number of Segments,1, ---[-] | ||
Gradient 1,70, ---[deg.C/km] | ||
Maximum Temperature,400, ---[deg.C] | ||
Number of Production Wells,1.0, ---[-] | ||
Number of Injection Wells,1.0, ---[-] | ||
Production Well Diameter,8.5, ---[inch] | ||
Injection Well Diameter,8.5, ---[inch] | ||
Ramey Production Wellbore Model,0, ---Should be 0 (disabled) or 1 (enabled) | ||
Production Wellbore Temperature Drop,5, ---[deg.C] | ||
Injection Wellbore Temperature Gain,3, ---[deg.C] | ||
Production Flow Rate per Well,70, ---[kg/s] | ||
Reservoir Volume Option,1, ---Should be 1,2,3 or 4. See manual for details. | ||
Fracture Shape,1, ---Should be 1,2,3 or 4 | ||
Fracture Area,200000, ---[m2] | ||
Number of Fractures,12, ---[-] | ||
Fracture Separation,80, ---[m] | ||
Injectivity Index,5, ---[kg/s/bar] | ||
Injection Temperature,70, ---[deg.C] | ||
Maximum Drawdown,1, ---[-] no redrilling considered | ||
Reservoir Heat Capacity,1000, ---[J/kg/K] | ||
Reservoir Density,3000, ---[kg/m3] | ||
Reservoir Thermal Conductivity,3, ---[W/m/K] | ||
Water Loss Fraction,0.02, ---[-] | ||
|
||
***Surface Technical Parameters*** | ||
********************************** | ||
|
||
End-Use Option,31, --- CHP Topping Cycle with electricity as the main product | ||
Power Plant Type,4, --- Double-Flash | ||
Circulation Pump Efficiency,.80, ---[-] | ||
Utilization Factor,.9, ---[-] | ||
End-Use Efficiency Factor,.9, ---[-] | ||
Surface Temperature,15, ---[deg.C] | ||
Ambient Temperature,15, ---[deg.C] | ||
|
||
***Financial Parameters*** | ||
************************** | ||
|
||
Plant Lifetime,35, ---[years] | ||
Economic Model,2, ---BICYCLE Levelized Cost Model | ||
Fraction of Investment in Bonds,.5, ---[-] Required for BICYCLE model | ||
Inflated Bond Interest Rate,.05, ---[-] Required for BICYCLE model | ||
Inflated Equity Interest Rate,.08, ---[-] Required for BICYCLE model | ||
Inflation Rate,.02, ---[-] Required for BICYCLE model | ||
Combined Income Tax Rate,.3, ---[-] Required for BICYCLE model | ||
Gross Revenue Tax Rate,0, ---[-] Required for BICYCLE model | ||
Investment Tax Credit Rate,0, ---[-] Required for BICYCLE model | ||
Property Tax Rate,0, ---[-] Required for BICYCLE model | ||
Inflation Rate During Construction,0.05, ---[-] | ||
|
||
***Capital and O&M Cost Parameters*** | ||
************************************* | ||
|
||
Well Drilling and Completion Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Well Drilling Cost Correlation,3, ---[-] use built in correlations | ||
Reservoir Stimulation Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Surface Plant Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Field Gathering System Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Exploration Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Wellfield O&M Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Surface Plant O&M Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Water Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Heat Rate,.02, ---[$/kWh] | ||
|
||
***Simulation Parameters*** | ||
*************************** | ||
|
||
Print Output to Console,1, ---Should be 1 (to print) or 0 (to not print) | ||
Time steps per year,10, ---[-] |
77 changes: 77 additions & 0 deletions
77
Engage-Testing/chp_test/chp_topping_depth_1.0_prod_1.0_inj_2.0_temp_400.txt
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,77 @@ | ||
---------------------------------------------------------------------------------------- | ||
GEOPHIRES v2.0 Input File | ||
---------------------------------------------------------------------------------------- | ||
***Subsurface technical parameters*** | ||
************************************* | ||
Reservoir Model,3, ---m/A Single Fracture Thermal Drawdown | ||
Drawdown Parameter,.00002, ---[kg/s/m2] | ||
Reservoir Depth,1.0, ---[km] | ||
Number of Segments,1, ---[-] | ||
Gradient 1,70, ---[deg.C/km] | ||
Maximum Temperature,400, ---[deg.C] | ||
Number of Production Wells,1.0, ---[-] | ||
Number of Injection Wells,2.0, ---[-] | ||
Production Well Diameter,8.5, ---[inch] | ||
Injection Well Diameter,8.5, ---[inch] | ||
Ramey Production Wellbore Model,0, ---Should be 0 (disabled) or 1 (enabled) | ||
Production Wellbore Temperature Drop,5, ---[deg.C] | ||
Injection Wellbore Temperature Gain,3, ---[deg.C] | ||
Production Flow Rate per Well,70, ---[kg/s] | ||
Reservoir Volume Option,1, ---Should be 1,2,3 or 4. See manual for details. | ||
Fracture Shape,1, ---Should be 1,2,3 or 4 | ||
Fracture Area,200000, ---[m2] | ||
Number of Fractures,12, ---[-] | ||
Fracture Separation,80, ---[m] | ||
Injectivity Index,5, ---[kg/s/bar] | ||
Injection Temperature,70, ---[deg.C] | ||
Maximum Drawdown,1, ---[-] no redrilling considered | ||
Reservoir Heat Capacity,1000, ---[J/kg/K] | ||
Reservoir Density,3000, ---[kg/m3] | ||
Reservoir Thermal Conductivity,3, ---[W/m/K] | ||
Water Loss Fraction,0.02, ---[-] | ||
|
||
***Surface Technical Parameters*** | ||
********************************** | ||
|
||
End-Use Option,31, --- CHP Topping Cycle with electricity as the main product | ||
Power Plant Type,4, --- Double-Flash | ||
Circulation Pump Efficiency,.80, ---[-] | ||
Utilization Factor,.9, ---[-] | ||
End-Use Efficiency Factor,.9, ---[-] | ||
Surface Temperature,15, ---[deg.C] | ||
Ambient Temperature,15, ---[deg.C] | ||
|
||
***Financial Parameters*** | ||
************************** | ||
|
||
Plant Lifetime,35, ---[years] | ||
Economic Model,2, ---BICYCLE Levelized Cost Model | ||
Fraction of Investment in Bonds,.5, ---[-] Required for BICYCLE model | ||
Inflated Bond Interest Rate,.05, ---[-] Required for BICYCLE model | ||
Inflated Equity Interest Rate,.08, ---[-] Required for BICYCLE model | ||
Inflation Rate,.02, ---[-] Required for BICYCLE model | ||
Combined Income Tax Rate,.3, ---[-] Required for BICYCLE model | ||
Gross Revenue Tax Rate,0, ---[-] Required for BICYCLE model | ||
Investment Tax Credit Rate,0, ---[-] Required for BICYCLE model | ||
Property Tax Rate,0, ---[-] Required for BICYCLE model | ||
Inflation Rate During Construction,0.05, ---[-] | ||
|
||
***Capital and O&M Cost Parameters*** | ||
************************************* | ||
|
||
Well Drilling and Completion Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Well Drilling Cost Correlation,3, ---[-] use built in correlations | ||
Reservoir Stimulation Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Surface Plant Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Field Gathering System Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Exploration Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Wellfield O&M Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Surface Plant O&M Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Water Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Heat Rate,.02, ---[$/kWh] | ||
|
||
***Simulation Parameters*** | ||
*************************** | ||
|
||
Print Output to Console,1, ---Should be 1 (to print) or 0 (to not print) | ||
Time steps per year,10, ---[-] |
77 changes: 77 additions & 0 deletions
77
Engage-Testing/chp_test/chp_topping_depth_1.0_prod_1.0_inj_3.0_temp_400.txt
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,77 @@ | ||
---------------------------------------------------------------------------------------- | ||
GEOPHIRES v2.0 Input File | ||
---------------------------------------------------------------------------------------- | ||
***Subsurface technical parameters*** | ||
************************************* | ||
Reservoir Model,3, ---m/A Single Fracture Thermal Drawdown | ||
Drawdown Parameter,.00002, ---[kg/s/m2] | ||
Reservoir Depth,1.0, ---[km] | ||
Number of Segments,1, ---[-] | ||
Gradient 1,70, ---[deg.C/km] | ||
Maximum Temperature,400, ---[deg.C] | ||
Number of Production Wells,1.0, ---[-] | ||
Number of Injection Wells,3.0, ---[-] | ||
Production Well Diameter,8.5, ---[inch] | ||
Injection Well Diameter,8.5, ---[inch] | ||
Ramey Production Wellbore Model,0, ---Should be 0 (disabled) or 1 (enabled) | ||
Production Wellbore Temperature Drop,5, ---[deg.C] | ||
Injection Wellbore Temperature Gain,3, ---[deg.C] | ||
Production Flow Rate per Well,70, ---[kg/s] | ||
Reservoir Volume Option,1, ---Should be 1,2,3 or 4. See manual for details. | ||
Fracture Shape,1, ---Should be 1,2,3 or 4 | ||
Fracture Area,200000, ---[m2] | ||
Number of Fractures,12, ---[-] | ||
Fracture Separation,80, ---[m] | ||
Injectivity Index,5, ---[kg/s/bar] | ||
Injection Temperature,70, ---[deg.C] | ||
Maximum Drawdown,1, ---[-] no redrilling considered | ||
Reservoir Heat Capacity,1000, ---[J/kg/K] | ||
Reservoir Density,3000, ---[kg/m3] | ||
Reservoir Thermal Conductivity,3, ---[W/m/K] | ||
Water Loss Fraction,0.02, ---[-] | ||
|
||
***Surface Technical Parameters*** | ||
********************************** | ||
|
||
End-Use Option,31, --- CHP Topping Cycle with electricity as the main product | ||
Power Plant Type,4, --- Double-Flash | ||
Circulation Pump Efficiency,.80, ---[-] | ||
Utilization Factor,.9, ---[-] | ||
End-Use Efficiency Factor,.9, ---[-] | ||
Surface Temperature,15, ---[deg.C] | ||
Ambient Temperature,15, ---[deg.C] | ||
|
||
***Financial Parameters*** | ||
************************** | ||
|
||
Plant Lifetime,35, ---[years] | ||
Economic Model,2, ---BICYCLE Levelized Cost Model | ||
Fraction of Investment in Bonds,.5, ---[-] Required for BICYCLE model | ||
Inflated Bond Interest Rate,.05, ---[-] Required for BICYCLE model | ||
Inflated Equity Interest Rate,.08, ---[-] Required for BICYCLE model | ||
Inflation Rate,.02, ---[-] Required for BICYCLE model | ||
Combined Income Tax Rate,.3, ---[-] Required for BICYCLE model | ||
Gross Revenue Tax Rate,0, ---[-] Required for BICYCLE model | ||
Investment Tax Credit Rate,0, ---[-] Required for BICYCLE model | ||
Property Tax Rate,0, ---[-] Required for BICYCLE model | ||
Inflation Rate During Construction,0.05, ---[-] | ||
|
||
***Capital and O&M Cost Parameters*** | ||
************************************* | ||
|
||
Well Drilling and Completion Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Well Drilling Cost Correlation,3, ---[-] use built in correlations | ||
Reservoir Stimulation Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Surface Plant Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Field Gathering System Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Exploration Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Wellfield O&M Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Surface Plant O&M Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Water Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Heat Rate,.02, ---[$/kWh] | ||
|
||
***Simulation Parameters*** | ||
*************************** | ||
|
||
Print Output to Console,1, ---Should be 1 (to print) or 0 (to not print) | ||
Time steps per year,10, ---[-] |
77 changes: 77 additions & 0 deletions
77
Engage-Testing/chp_test/chp_topping_depth_1.0_prod_1.0_inj_4.0_temp_400.txt
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,77 @@ | ||
---------------------------------------------------------------------------------------- | ||
GEOPHIRES v2.0 Input File | ||
---------------------------------------------------------------------------------------- | ||
***Subsurface technical parameters*** | ||
************************************* | ||
Reservoir Model,3, ---m/A Single Fracture Thermal Drawdown | ||
Drawdown Parameter,.00002, ---[kg/s/m2] | ||
Reservoir Depth,1.0, ---[km] | ||
Number of Segments,1, ---[-] | ||
Gradient 1,70, ---[deg.C/km] | ||
Maximum Temperature,400, ---[deg.C] | ||
Number of Production Wells,1.0, ---[-] | ||
Number of Injection Wells,4.0, ---[-] | ||
Production Well Diameter,8.5, ---[inch] | ||
Injection Well Diameter,8.5, ---[inch] | ||
Ramey Production Wellbore Model,0, ---Should be 0 (disabled) or 1 (enabled) | ||
Production Wellbore Temperature Drop,5, ---[deg.C] | ||
Injection Wellbore Temperature Gain,3, ---[deg.C] | ||
Production Flow Rate per Well,70, ---[kg/s] | ||
Reservoir Volume Option,1, ---Should be 1,2,3 or 4. See manual for details. | ||
Fracture Shape,1, ---Should be 1,2,3 or 4 | ||
Fracture Area,200000, ---[m2] | ||
Number of Fractures,12, ---[-] | ||
Fracture Separation,80, ---[m] | ||
Injectivity Index,5, ---[kg/s/bar] | ||
Injection Temperature,70, ---[deg.C] | ||
Maximum Drawdown,1, ---[-] no redrilling considered | ||
Reservoir Heat Capacity,1000, ---[J/kg/K] | ||
Reservoir Density,3000, ---[kg/m3] | ||
Reservoir Thermal Conductivity,3, ---[W/m/K] | ||
Water Loss Fraction,0.02, ---[-] | ||
|
||
***Surface Technical Parameters*** | ||
********************************** | ||
|
||
End-Use Option,31, --- CHP Topping Cycle with electricity as the main product | ||
Power Plant Type,4, --- Double-Flash | ||
Circulation Pump Efficiency,.80, ---[-] | ||
Utilization Factor,.9, ---[-] | ||
End-Use Efficiency Factor,.9, ---[-] | ||
Surface Temperature,15, ---[deg.C] | ||
Ambient Temperature,15, ---[deg.C] | ||
|
||
***Financial Parameters*** | ||
************************** | ||
|
||
Plant Lifetime,35, ---[years] | ||
Economic Model,2, ---BICYCLE Levelized Cost Model | ||
Fraction of Investment in Bonds,.5, ---[-] Required for BICYCLE model | ||
Inflated Bond Interest Rate,.05, ---[-] Required for BICYCLE model | ||
Inflated Equity Interest Rate,.08, ---[-] Required for BICYCLE model | ||
Inflation Rate,.02, ---[-] Required for BICYCLE model | ||
Combined Income Tax Rate,.3, ---[-] Required for BICYCLE model | ||
Gross Revenue Tax Rate,0, ---[-] Required for BICYCLE model | ||
Investment Tax Credit Rate,0, ---[-] Required for BICYCLE model | ||
Property Tax Rate,0, ---[-] Required for BICYCLE model | ||
Inflation Rate During Construction,0.05, ---[-] | ||
|
||
***Capital and O&M Cost Parameters*** | ||
************************************* | ||
|
||
Well Drilling and Completion Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Well Drilling Cost Correlation,3, ---[-] use built in correlations | ||
Reservoir Stimulation Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Surface Plant Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Field Gathering System Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Exploration Capital Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Wellfield O&M Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Surface Plant O&M Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Water Cost Adjustment Factor,1, ---[-] use built in correlations | ||
Heat Rate,.02, ---[$/kWh] | ||
|
||
***Simulation Parameters*** | ||
*************************** | ||
|
||
Print Output to Console,1, ---Should be 1 (to print) or 0 (to not print) | ||
Time steps per year,10, ---[-] |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,6 @@ | ||
numpy | ||
pandas | ||
matplotlib | ||
mpmath | ||
plotly | ||
scipy |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,5 @@ | ||
,Depth (m),Number of Prod Wells,Number of Inj Wells,Maximum Reservoir Temperature (deg.C),Wellfield Cost ($M),Surface Plant Cost ($M),Exploration Cost ($M),Field Gathering System Cost ($M),Wellfield O&M Cost ($M/year),Surface Plant O&M Cost ($M/year),Make-Up Water O&M Cost ($M/year),Average Reservoir Heat Extraction (MWth),Average Total Electricity Generation (MWe),Lifetime | ||
3,1.0,1,1,400.0,4.6,6.51,2.98,1.19,0.12,0.29,0.04,0.56,0.56,35 | ||
2,1.0,1,2,400.0,6.9,6.51,2.98,1.6,0.15,0.29,0.04,0.56,0.56,35 | ||
0,1.0,1,3,400.0,9.2,6.51,2.98,2.05,0.18,0.29,0.04,0.56,0.56,35 | ||
1,1.0,1,4,400.0,11.5,6.51,2.98,2.51,0.2,0.29,0.04,0.56,0.56,35 |
Oops, something went wrong.