Notifications
You must be signed in to change notification settings - Fork 3
Commit
- Loading branch information
There are no files selected for viewing
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Large diffs are not rendered by default.
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,27 @@ | ||
technology,parameter,value,unit,source,further description | ||
gas,fuel,16.0,EUR/MWh_th,Ariadne, | ||
oil,fuel,33.2457,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh" | ||
coal,fuel,6.7391,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh" | ||
decentral air-sourced heat pump,investment,1685,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf | ||
decentral ground-sourced heat pump,investment,2774,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf | ||
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES | ||
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation" | ||
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021, | ||
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" | ||
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023 | ||
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023 | ||
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021, | ||
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023, | ||
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground" | ||
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground" | ||
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig" | ||
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig" | ||
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig" | ||
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig" | ||
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" |
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,27 @@ | ||
technology,parameter,value,unit,source,further description | ||
gas,fuel,11.2,EUR/MWh_th,Ariadne, | ||
oil,fuel,22.1982,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh" | ||
coal,fuel,5.7048,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh" | ||
decentral air-sourced heat pump,investment,1685,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf | ||
decentral ground-sourced heat pump,investment,2774,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf | ||
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES | ||
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation" | ||
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021, | ||
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" | ||
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023 | ||
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023 | ||
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021, | ||
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023, | ||
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground" | ||
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground" | ||
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig" | ||
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig" | ||
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig" | ||
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig" | ||
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" |
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,27 @@ | ||
technology,parameter,value,unit,source,further description | ||
gas,fuel,40,EUR/MWh_th,Ariadne, | ||
oil,fuel,32.9876,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh" | ||
coal,fuel,10.6694,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh" | ||
decentral air-sourced heat pump,investment,1604,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA | ||
decentral ground-sourced heat pump,investment,2682,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA | ||
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES | ||
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation" | ||
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021, | ||
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" | ||
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023 | ||
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023 | ||
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021, | ||
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023, | ||
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground" | ||
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground" | ||
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig" | ||
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig" | ||
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig" | ||
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig" | ||
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" |
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,27 @@ | ||
technology,parameter,value,unit,source,further description | ||
gas,fuel,22.3,EUR/MWh_th,Ariadne, | ||
oil,fuel,38.821,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh" | ||
coal,fuel,6.2056,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh" | ||
decentral air-sourced heat pump,investment,1523,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA | ||
decentral ground-sourced heat pump,investment,2589,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA | ||
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES | ||
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation" | ||
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021, | ||
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" | ||
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023 | ||
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023 | ||
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021, | ||
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023, | ||
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground" | ||
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground" | ||
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig" | ||
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig" | ||
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig" | ||
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig" | ||
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" |
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,27 @@ | ||
technology,parameter,value,unit,source,further description | ||
gas,fuel,22.4,EUR/MWh_th,Ariadne, | ||
oil,fuel,38.5629,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh" | ||
coal,fuel,6.2601,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh" | ||
decentral air-sourced heat pump,investment,1483,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA | ||
decentral ground-sourced heat pump,investment,2497,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA | ||
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES | ||
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation" | ||
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021, | ||
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" | ||
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023 | ||
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023 | ||
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021, | ||
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023, | ||
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground" | ||
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground" | ||
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig" | ||
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig" | ||
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig" | ||
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig" | ||
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" |
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,27 @@ | ||
technology,parameter,value,unit,source,further description | ||
gas,fuel,22.6,EUR/MWh_th,Ariadne, | ||
oil,fuel,38.3564,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh" | ||
coal,fuel,6.3036,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh" | ||
decentral air-sourced heat pump,investment,1442,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA | ||
decentral ground-sourced heat pump,investment,2404,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA | ||
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES | ||
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation" | ||
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021, | ||
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" | ||
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023 | ||
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023 | ||
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021, | ||
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023, | ||
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground" | ||
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground" | ||
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig" | ||
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig" | ||
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig" | ||
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig" | ||
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" |
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,27 @@ | ||
technology,parameter,value,unit,source,further description | ||
gas,fuel,22.8,EUR/MWh_th,Ariadne, | ||
oil,fuel,38.0983,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh" | ||
coal,fuel,6.3472,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh" | ||
decentral air-sourced heat pump,investment,1402,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA | ||
decentral ground-sourced heat pump,investment,2312,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA | ||
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES | ||
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage" | ||
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation" | ||
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021, | ||
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023, | ||
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" | ||
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023 | ||
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023 | ||
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021, | ||
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023, | ||
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground" | ||
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground" | ||
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig" | ||
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig" | ||
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig" | ||
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig" | ||
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig" | ||
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig" |