1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/mean/costs_2020.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/mean/costs_2025.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/mean/costs_2030.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/mean/costs_2035.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/mean/costs_2040.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/mean/costs_2045.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/mean/costs_2050.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/optimist/costs_2020.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/optimist/costs_2025.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/optimist/costs_2030.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/optimist/costs_2035.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/optimist/costs_2040.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/optimist/costs_2045.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/pessimist/costs_2020.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/pessimist/costs_2025.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/pessimist/costs_2030.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/pessimist/costs_2035.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/pessimist/costs_2040.csv

Large diffs are not rendered by default.

1,055 changes: 1,055 additions & 0 deletions ariadne-data/costs/pessimist/costs_2045.csv

Large diffs are not rendered by default.

27 changes: 27 additions & 0 deletions ariadne-data/costs_2019-modifications.csv
Original file line number Diff line number Diff line change
@@ -0,0 +1,27 @@
technology,parameter,value,unit,source,further description
gas,fuel,16.0,EUR/MWh_th,Ariadne,
oil,fuel,33.2457,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh"
coal,fuel,6.7391,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh"
decentral air-sourced heat pump,investment,1685,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf
decentral ground-sourced heat pump,investment,2774,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage"
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage"
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation"
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021,
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021,
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023,
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground"
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground"
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig"
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig"
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig"
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig"
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
27 changes: 27 additions & 0 deletions ariadne-data/costs_2020-modifications.csv
Original file line number Diff line number Diff line change
@@ -0,0 +1,27 @@
technology,parameter,value,unit,source,further description
gas,fuel,11.2,EUR/MWh_th,Ariadne,
oil,fuel,22.1982,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh"
coal,fuel,5.7048,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh"
decentral air-sourced heat pump,investment,1685,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf
decentral ground-sourced heat pump,investment,2774,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage"
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage"
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation"
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021,
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021,
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023,
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground"
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground"
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig"
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig"
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig"
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig"
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
27 changes: 27 additions & 0 deletions ariadne-data/costs_2025-modifications.csv
Original file line number Diff line number Diff line change
@@ -0,0 +1,27 @@
technology,parameter,value,unit,source,further description
gas,fuel,40,EUR/MWh_th,Ariadne,
oil,fuel,32.9876,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh"
coal,fuel,10.6694,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh"
decentral air-sourced heat pump,investment,1604,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA
decentral ground-sourced heat pump,investment,2682,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage"
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage"
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation"
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021,
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021,
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023,
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground"
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground"
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig"
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig"
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig"
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig"
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
27 changes: 27 additions & 0 deletions ariadne-data/costs_2030-modifications.csv
Original file line number Diff line number Diff line change
@@ -0,0 +1,27 @@
technology,parameter,value,unit,source,further description
gas,fuel,22.3,EUR/MWh_th,Ariadne,
oil,fuel,38.821,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh"
coal,fuel,6.2056,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh"
decentral air-sourced heat pump,investment,1523,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA
decentral ground-sourced heat pump,investment,2589,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage"
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage"
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation"
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021,
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021,
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023,
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground"
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground"
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig"
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig"
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig"
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig"
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
27 changes: 27 additions & 0 deletions ariadne-data/costs_2035-modifications.csv
Original file line number Diff line number Diff line change
@@ -0,0 +1,27 @@
technology,parameter,value,unit,source,further description
gas,fuel,22.4,EUR/MWh_th,Ariadne,
oil,fuel,38.5629,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh"
coal,fuel,6.2601,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh"
decentral air-sourced heat pump,investment,1483,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA
decentral ground-sourced heat pump,investment,2497,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage"
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage"
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation"
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021,
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021,
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023,
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground"
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground"
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig"
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig"
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig"
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig"
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
27 changes: 27 additions & 0 deletions ariadne-data/costs_2040-modifications.csv
Original file line number Diff line number Diff line change
@@ -0,0 +1,27 @@
technology,parameter,value,unit,source,further description
gas,fuel,22.6,EUR/MWh_th,Ariadne,
oil,fuel,38.3564,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh"
coal,fuel,6.3036,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh"
decentral air-sourced heat pump,investment,1442,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA
decentral ground-sourced heat pump,investment,2404,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage"
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage"
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation"
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021,
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021,
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023,
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground"
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground"
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig"
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig"
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig"
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig"
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
27 changes: 27 additions & 0 deletions ariadne-data/costs_2045-modifications.csv
Original file line number Diff line number Diff line change
@@ -0,0 +1,27 @@
technology,parameter,value,unit,source,further description
gas,fuel,22.8,EUR/MWh_th,Ariadne,
oil,fuel,38.0983,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1bbl = 1.6998MWh"
coal,fuel,6.3472,EUR2020/MWh,Ariadne,"$2020 = 0.8775 EUR2020, 1t = 8.06 MWh"
decentral air-sourced heat pump,investment,1402,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA
decentral ground-sourced heat pump,investment,2312,EUR2020/kW_th,https://ariadneprojekt.de/media/2024/01/Ariadne-Analyse_HeizkostenEmissionenGebaeude_Januar2024.pdf https://www.enpal.de/waermepumpe/kosten/ https://www.bdew.de/media/documents/BDEW-HKV_Altbau.pdf and cost reduction from DEA
electricity distribution grid,investment,1500,EUR2020/kW,oriented towards JRC-EU-TIMES
HVAC overhead,investment,472,EUR2020/MW/km,NEP2021,"Assuming High Temperature Low Sag Cables with higher Amperage"
HVAC overhead,investment,772,EUR2020/MW/km,NEP2023,"Assuming High Temperature Low Sag Cables with higher Amperage"
offwind-ac-connection-submarine,investment,3786,EUR2020/MW/km,NEP2021,"220kv, 1A, 2 circuits, 3 phases, inflation"
offwind-ac-connection-submarine,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-connection-underground,investment,3786,EUR2020/MW/km,NEP2021,
offwind-ac-connection-underground,investment,2488,EUR2020/MW/km,NEP2023,
offwind-ac-station,investment,697,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-ac-station,investment,722,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
HVDC inverter pair,investment,597015,EUR2020/MW,NEP2021+NEP2023
HVDC overhead,investment,995,EUR2020/MW/km,NEP2021+NEP2023
HVDC underground,investment,3234,EUR2020/MW/km,NEP2021,
HVDC underground,investment,2978,EUR2020/MW/km,NEP2023,
HVDC submarine,investment,3234,EUR2020/MW/km,NEP2021,"set equal to HVDC underground"
HVDC submarine,investment,2978,EUR2020/MW/km,NEP2023,"set equal to HVDC underground"
offwind-dc-connection-submarine,investment,1990,EUR2020/MW/km,NEP2021,"DC 525kv seeseitig"
offwind-dc-connection-submarine,investment,2708,EUR2020/MW/km,NEP2023,"DC 525kv seeseitig"
offwind-dc-connection-underground,investment,3234,EUR2020/MW/km,NEP2021,"DC 525kv landseitig"
offwind-dc-connection-underground,investment,3430,EUR2020/MW/km,NEP2023,"DC 525kv landseitig"
offwind-dc-station,investment,746,EUR2020/kW,NEP2021,"cost of two stations, landseitig and seeseitig"
offwind-dc-station,investment,903,EUR2020/kW,NEP2023,"cost of two stations, landseitig and seeseitig"
Loading

0 comments on commit cdedf0b

Please sign in to comment.