Skip to content

Merge pull request #3558 from optout21/funding-fee-estimation #6154

Merge pull request #3558 from optout21/funding-fee-estimation

Merge pull request #3558 from optout21/funding-fee-estimation #6154

Triggered via push February 13, 2025 22:07
Status Cancelled
Total duration 50m 49s
Artifacts

build.yml

on: push
Matrix: build-tx-sync
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

19 errors and 1 warning
incremental-mutants
Process completed with exit code 1.
build (windows-latest, stable)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/heads/upstream/main' exists
build (windows-latest, stable)
The operation was canceled.
build (windows-latest, beta)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/heads/upstream/main' exists
build (windows-latest, beta)
The operation was canceled.
fuzz
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/heads/upstream/main' exists
fuzz
The operation was canceled.
build (ubuntu-latest, 1.63.0)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/heads/upstream/main' exists
build (ubuntu-latest, 1.63.0)
The operation was canceled.
build (ubuntu-latest, stable)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/heads/upstream/main' exists
build (ubuntu-latest, stable)
The operation was canceled.
build (macos-latest, stable)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/heads/upstream/main' exists
build (macos-latest, stable)
The operation was canceled.
build (ubuntu-latest, beta)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/heads/upstream/main' exists
build (ubuntu-latest, beta)
The operation was canceled.
build (macos-latest, 1.63.0)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/heads/upstream/main' exists
build (macos-latest, 1.63.0)
The operation was canceled.
build (macos-latest, beta)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/heads/upstream/main' exists
build (macos-latest, beta)
The operation was canceled.
incremental-mutants
Cache not found for keys: v0-rust-incremental-mutants-Linux-b0db9221-a19b794e, v0-rust-incremental-mutants-Linux-b0db9221