Skip to content

spotless:apply

spotless:apply #842

Triggered via push November 27, 2024 12:14
Status Failure
Total duration 5h 20m 10s
Artifacts 7

ci.yml

on: push
Default (Java 11)  /  Compile
9m 36s
Default (Java 11) / Compile
Pre-compile Checks  /  Basic QA
14m 16s
Pre-compile Checks / Basic QA
Default (Java 11)  /  Test packaging/licensing
33m 46s
Default (Java 11) / Test packaging/licensing
Matrix: Default (Java 11) / e2e
Matrix: Default (Java 11) / test
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Default (Java 11) / Test (module: table)
Process completed with exit code 1.
Default (Java 11) / E2E (group 2)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 310 minutes.
Default (Java 11) / E2E (group 2)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
build-artifacts-flink-ci-beta-842 Expired
91.9 MB
logs-test-flink-ci-beta-842-connect-test-1732710460
3.76 MB
logs-test-flink-ci-beta-842-core-test-1732710478
15.4 MB
logs-test-flink-ci-beta-842-misc-test-1732710473
1.49 MB
logs-test-flink-ci-beta-842-python-test-1732710471
4.96 MB
logs-test-flink-ci-beta-842-table-test-1732710480
40.5 MB
logs-test-flink-ci-beta-842-tests-test-1732710475
20.2 MB