Skip to content

Fixes workflow and adds missing executables #721

Fixes workflow and adds missing executables

Fixes workflow and adds missing executables #721

Triggered via push June 19, 2024 07:37
Status Cancelled
Total duration 55s
Artifacts

ci.yml

on: push
Default (Java 8)  /  Compile
43s
Default (Java 8) / Compile
Pre-compile Checks  /  Basic QA
47s
Pre-compile Checks / Basic QA
Default (Java 8)  /  Test packaging/licensing
0s
Default (Java 8) / Test packaging/licensing
Matrix: Default (Java 8) / e2e
Matrix: Default (Java 8) / test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Default (Java 8) / Compile
The run was canceled by @XComp.
Default (Java 8) / Compile
The operation was canceled.
Pre-compile Checks / Basic QA
The run was canceled by @XComp.
Pre-compile Checks / Basic QA
The operation was canceled.