Skip to content

Commit

Permalink
fix typo
Browse files Browse the repository at this point in the history
  • Loading branch information
brentstone committed Aug 22, 2024
1 parent 677393e commit 6d400ea
Showing 1 changed file with 1 addition and 1 deletion.
Original file line number Diff line number Diff line change
Expand Up @@ -78,7 +78,7 @@ The governance mechanism defines different criteria depending on proposal type i

**Default proposals** require at least 2/3 of the total active voting power to have voted AND the `yay` voting power must be at least 2/3 of the combined `yay + nay` voting power.

**PGF steward proposals** require at least 1/3 of the total acive voting power to have voted AND the `yay` voting power must be larger than the `nay` voting power.
**PGF steward proposals** require at least 1/3 of the total active voting power to have voted AND the `yay` voting power must be larger than the `nay` voting power.

**Funding proposals** are tallied differently depending on if the proposal author is a PGF steward:
- Non-steward: the funding proposal is tallied in the same way as the PGF steward proposal (above).
Expand Down

0 comments on commit 6d400ea

Please sign in to comment.