Michael Owen A researcher in the field of high energy physics Male Works in Harvard University for years Has 2 children |
---|
- Provide scientific correctness of the graph
- Knows how to use fundamental functionality of the platform
- Respected in the field of high energy physics
- While watching the sunset from his 32 inch display in one of the dark physics labs of Harvard, he gets a review request from the system and he accepts the request
- With 2(to be decided) other reviewers designated for this review he starts reviewing the scientific contribution request
- He reports the mistakes he found to the researchers by opening issues
- He reviews the edges(references or connections to former works) proposed and corrects some of them by adding or removing, these corrections have to be approved by other reviewers(and maybe the publishers)
- After all is done, the review is completed, and if other reviewers also approve, the node/nodes are added to the system automatically and their connections to the former works(edges) are established
- 1.1.1.3.1 Reviewers shall be able to accept or reject the nodes which are submitted by contributors
- 1.2.2.1 The platform shall assign some number of related and competent contributors for a node or objection as reviewers randomly.
- 1.2.2.1 The platform shall assign some number of related and competent contributors for a node or objection as reviewers randomly.
See Requirements.
🏠 Home
- Hakan Emre Aktas
- Ahmed Bera Pay
- Ömer Şükrü Uyduran
- Mehmet Süzer
- Ahmet Abdullah Susuz
- Ali Mert Geben
- Oğuz Pançuk
- Arda Arslan
- Zülal Molla
- Leyla Yayladere
- Omer Faruk Unal
- Bengisu Kübra Takkin
451 Weekly Progress Reports
- Progress Report #1 | 03.10.2023
- Progress Report #2 | 10.10.2023
- Progress Report #3 | 17.10.2023
- Progress Report #4 | 24.10.2023
- Progress Report #5 | 07.11.2023
- Progress Report #6 | 14.11.2023
- Progress Report #7 | 21.11.2023
- Progress Report #8 | 05.12.2023
- Progress Report #9 | 12.12.2023
- Progress Report #10 | 19.12.2023
352 Meeting Notes
- Meeting #1 | 08.03.2023
- Meeting #2 | 13.03.2023
- Meeting #3 | 15.03.2023
- Meeting #4 | 22.03.2023
- Meeting #5 | 24.03.2023
- Meeting #6 | 30.03.2023
- Meeting #7 | 05.04.2023
- Meeting #8 | 07.04.2023
- Meeting #9 | 19.04.2023
- Meeting #10 | 27.04.2023
- Meeting #11 | 03.05.2023
- Meeting #12 | 06.05.2023
- Meeting #13 | 08.05.2023
- Meeting #14 | 10.05.2023
- CmpE451 Customer Milestone 1 Report
- CmpE451 Customer Milestone 2 Report
- CmpE451 Final Milestone Report