itest: use local whatthefee #4
ci.yaml
on: push
Matrix: compile-cln
Format Check
18s
itest grpc check
20s
Clippy
1m 21s
Unit tests
26s
Matrix: Integration tests
Annotations
7 errors
Integration tests (v23.11.2)
Process completed with exit code 2.
|
Integration tests (v24.05)
The job was canceled because "v23_11_2" failed.
|
Integration tests (v24.05)
The operation was canceled.
|
Integration tests (v24.02.2)
The job was canceled because "v23_11_2" failed.
|
Integration tests (v24.02.2)
The operation was canceled.
|
Integration tests (v24.08)
The job was canceled because "v23_11_2" failed.
|
Integration tests (v24.08)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
Linux-X64-cln-v23.11.2
|
103 MB |
|
Linux-X64-cln-v24.02.2
|
105 MB |
|
Linux-X64-cln-v24.05
|
112 MB |
|
Linux-X64-cln-v24.08
|
116 MB |
|