Skip to content

monitor redeem transactions #17

monitor redeem transactions

monitor redeem transactions #17

Triggered via push September 27, 2024 10:04
Status Failure
Total duration 4m 12s
Artifacts 4

ci.yaml

on: push
Matrix: compile-cln
Matrix: Integration tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Integration tests (v24.02.2)
Process completed with exit code 2.
Integration tests (v23.11.2)
The job was canceled because "v24_02_2" failed.
Integration tests (v23.11.2)
Process completed with exit code 2.
Integration tests (v24.05)
The job was canceled because "v24_02_2" failed.
Integration tests (v24.05)
The operation was canceled.
Integration tests (v24.08)
The job was canceled because "v24_02_2" failed.
Integration tests (v24.08)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
Linux-X64-cln-v23.11.2
103 MB
Linux-X64-cln-v24.02.2
105 MB
Linux-X64-cln-v24.05
112 MB
Linux-X64-cln-v24.08
116 MB