Integration tests #39
scheduled_integration_test.yml
on: schedule
Matrix: setup-environment
Matrix: Run Integration Tests
Annotations
5 errors
Run Integration Tests (3.10)
Process completed with exit code 2.
|
Run Integration Tests (3.11)
The job was canceled because "_3_10" failed.
|
Run Integration Tests (3.11)
Process completed with exit code 2.
|
Run Integration Tests (3.12)
The job was canceled because "_3_10" failed.
|
Run Integration Tests (3.12)
Process completed with exit code 2.
|