Skip to content

Pull request checks - physcat - #890: Add support for creating bigquery labels from meta #1075

Pull request checks - physcat - #890: Add support for creating bigquery labels from meta

Pull request checks - physcat - #890: Add support for creating bigquery labels from meta #1075

Triggered via pull request March 7, 2025 16:50
@physcatphyscat
synchronize #890
Status Cancelled
Total duration 2m 21s
Artifacts

pull-request-checks.yml

on: pull_request_target
affected-packages
5s
affected-packages
code-quality  /  code-quality
30s
code-quality / code-quality
Matrix: changelog-entry-check
Matrix: unit-tests
Matrix: verify-build
integration-tests  /  integration-tests-athena
0s
integration-tests / integration-tests-athena
integration-tests  /  integration-tests-bigquery
1m 26s
integration-tests / integration-tests-bigquery
integration-tests  /  integration-tests-bigquery-flaky
1m 28s
integration-tests / integration-tests-bigquery-flaky
integration-tests  /  integration-tests-postgres
0s
integration-tests / integration-tests-postgres
integration-tests  /  integration-tests-redshift
0s
integration-tests / integration-tests-redshift
integration-tests  /  integration-tests-redshift-flaky
0s
integration-tests / integration-tests-redshift-flaky
integration-tests  /  integration-tests-snowflake
0s
integration-tests / integration-tests-snowflake
Matrix: integration-tests / integration-tests-spark
integration-tests  /  integration-tests-postgres-psycopg2-check
0s
integration-tests / integration-tests-postgres-psycopg2-check
Pull request checks
3s
Pull request checks
Fit to window
Zoom out
Zoom in

Annotations

7 errors
unit-tests (dbt-bigquery) / unit-tests
Canceling since a higher priority waiting request for 'Pull request checks-890' exists
unit-tests (dbt-bigquery) / unit-tests
The operation was canceled.
integration-tests / integration-tests-bigquery
Canceling since a higher priority waiting request for 'Pull request checks-890' exists
integration-tests / integration-tests-bigquery
The operation was canceled.
integration-tests / integration-tests-bigquery-flaky
Canceling since a higher priority waiting request for 'Pull request checks-890' exists
integration-tests / integration-tests-bigquery-flaky
The operation was canceled.
Pull request checks
Process completed with exit code 1.