Chore update deps jan 2025 #3833
ci.yml
on: pull_request
fmt
26s
build-docker
36s
cargo-deny
20s
cargo-msrv
3m 36s
style
9s
conventional-commits
4s
spelling
27s
Matrix: build-cross
Matrix: clippy
Matrix: sim-test
Matrix: test
Annotations
15 errors
build-docker
Process completed with exit code 1.
|
test (linux-nightly)
Process completed with exit code 101.
|
test (linux-beta)
The job was canceled because "linux-nightly" failed.
|
test (linux-beta)
The operation was canceled.
|
test (windows-stable)
The job was canceled because "linux-nightly" failed.
|
test (windows-stable)
The operation was canceled.
|
test (linux-stable)
The job was canceled because "linux-nightly" failed.
|
test (linux-stable)
The operation was canceled.
|
test (linux-musl-stable)
The job was canceled because "linux-nightly" failed.
|
test (linux-musl-stable)
The operation was canceled.
|
test (macos-stable)
The job was canceled because "linux-nightly" failed.
|
test (macos-stable)
The operation was canceled.
|
test (macos-stable-arm64)
The job was canceled because "linux-nightly" failed.
|
test (macos-stable-arm64)
The operation was canceled.
|
cargo-msrv
Process completed with exit code 1.
|