refactor(vdp): retire connector-backend endpoints (#111) #300
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
integration-test.yml
on: push
Build and push image
/
docker-hub
32s
PR head branch
0s
Matrix: Core Backends
Matrix: Model Backends
Matrix: VDP Backends
Annotations
7 errors
VDP Backends (controller-vdp) / integration-test-latest-linux
Process completed with exit code 1.
|
VDP Backends (pipeline-backend) / integration-test-latest-linux
Process completed with exit code 1.
|
Core Backends (mgmt-backend) / integration-test-latest-mac
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
|
VDP Backends (controller-vdp) / integration-test-latest-mac
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
|
VDP Backends (pipeline-backend) / integration-test-latest-mac
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
|
Model Backends (controller-model) / integration-test-latest-mac
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
|
Integration Test
Canceling since a higher priority waiting request for 'Integration Test-refs/heads/main' exists
|