Skip to content

chore: merge back master #116

chore: merge back master

chore: merge back master #116

Triggered via push January 22, 2025 14:43
Status Failure
Total duration 3m 18s
Artifacts
Matrix: Check types
Matrix: Lint
Matrix: Functional Tests
Release package
0s
Documentation - Deploy
0s

Annotations

5 errors
Functional Tests (18)
Process completed with exit code 1.
Functional Tests (20)
The job was canceled because "_18" failed.
Functional Tests (20)
Process completed with exit code 1.
Functional Tests (22)
The job was canceled because "_18" failed.
Functional Tests (22)
The operation was canceled.