Skip to content

feat: sync committee message production #4141

feat: sync committee message production

feat: sync committee message production #4141

Triggered via pull request August 22, 2024 23:03
Status Cancelled
Total duration 1m 39s
Artifacts

ci.yml

on: pull_request
Build native libraries
6s
Build native libraries
Download Beacon Node OAPI
4s
Download Beacon Node OAPI
Download spectests
4s
Download spectests
Matrix: Run spec-tests
All spec-tests passed
0s
All spec-tests passed
Fit to window
Zoom out
Zoom in

Annotations

17 errors
Build Docker image
Canceling since a higher priority waiting request for 'CI-refs/pull/1280/merge' exists
Build Docker image
The operation was canceled.
Build project
Canceling since a higher priority waiting request for 'CI-refs/pull/1280/merge' exists
Build project
The operation was canceled.
Lint
Canceling since a higher priority waiting request for 'CI-refs/pull/1280/merge' exists
Lint
The operation was canceled.
Run spec-tests (deneb, general)
Canceling since a higher priority waiting request for 'CI-refs/pull/1280/merge' exists
Run spec-tests (deneb, general)
The operation was canceled.
Run spec-tests (deneb, minimal)
Canceling since a higher priority waiting request for 'CI-refs/pull/1280/merge' exists
Run spec-tests (deneb, minimal)
The operation was canceled.
Start and stop the node
Canceling since a higher priority waiting request for 'CI-refs/pull/1280/merge' exists
Start and stop the node
The operation was canceled.
Test
Canceling since a higher priority waiting request for 'CI-refs/pull/1280/merge' exists
Test
The operation was canceled.
Run spec-tests (deneb, mainnet)
Canceling since a higher priority waiting request for 'CI-refs/pull/1280/merge' exists
Run spec-tests (deneb, mainnet)
The operation was canceled.
All spec-tests passed
Process completed with exit code 1.