feat: enhancing loki logging capture #4255
Triggered via pull request
September 27, 2024 14:53
Status
Cancelled
Total duration
2m 23s
Artifacts
–
ci.yml
on: pull_request
Build native libraries
7s
Download Beacon Node OAPI
4s
Download spectests
4s
Build Docker image
1m 38s
Lint
1m 43s
Build project
1m 25s
Start and stop the node
1m 22s
Test
1m 23s
Matrix: Run spec-tests
All spec-tests passed
0s
Annotations
17 errors
Build Docker image
Canceling since a higher priority waiting request for 'CI-refs/pull/1310/merge' exists
|
Build Docker image
The operation was canceled.
|
Build project
Canceling since a higher priority waiting request for 'CI-refs/pull/1310/merge' exists
|
Build project
The operation was canceled.
|
Start and stop the node
Canceling since a higher priority waiting request for 'CI-refs/pull/1310/merge' exists
|
Start and stop the node
The operation was canceled.
|
Run spec-tests (deneb, minimal)
Canceling since a higher priority waiting request for 'CI-refs/pull/1310/merge' exists
|
Run spec-tests (deneb, minimal)
The operation was canceled.
|
Test
Canceling since a higher priority waiting request for 'CI-refs/pull/1310/merge' exists
|
Test
The operation was canceled.
|
Run spec-tests (deneb, mainnet)
Canceling since a higher priority waiting request for 'CI-refs/pull/1310/merge' exists
|
Run spec-tests (deneb, mainnet)
The operation was canceled.
|
Run spec-tests (deneb, general)
Canceling since a higher priority waiting request for 'CI-refs/pull/1310/merge' exists
|
Run spec-tests (deneb, general)
The operation was canceled.
|
Lint
Canceling since a higher priority waiting request for 'CI-refs/pull/1310/merge' exists
|
Lint
The operation was canceled.
|
All spec-tests passed
Process completed with exit code 1.
|