chore(deps): bump protobuf from 0.14.0 to 0.14.1 #4522
ci.yml
on: pull_request
Build native libraries
12s
Download Beacon Node OAPI
4s
Download spectests
3s
Build Docker image
2m 11s
Lint
1m 47s
Build project
1m 55s
Start and stop the node
1m 57s
Test
1m 55s
Matrix: Run spec-tests
All spec-tests passed
0s
Annotations
15 errors
Build Docker image
Canceling since a higher priority waiting request for 'CI-refs/pull/1394/merge' exists
|
Build Docker image
The operation was canceled.
|
Run spec-tests (deneb, mainnet)
Canceling since a higher priority waiting request for 'CI-refs/pull/1394/merge' exists
|
Run spec-tests (deneb, mainnet)
The operation was canceled.
|
Run spec-tests (deneb, general)
Canceling since a higher priority waiting request for 'CI-refs/pull/1394/merge' exists
|
Run spec-tests (deneb, general)
The operation was canceled.
|
Run spec-tests (deneb, minimal)
Canceling since a higher priority waiting request for 'CI-refs/pull/1394/merge' exists
|
Run spec-tests (deneb, minimal)
The operation was canceled.
|
Test
Canceling since a higher priority waiting request for 'CI-refs/pull/1394/merge' exists
|
Test
The operation was canceled.
|
Build project
Canceling since a higher priority waiting request for 'CI-refs/pull/1394/merge' exists
|
Build project
The operation was canceled.
|
Start and stop the node
Canceling since a higher priority waiting request for 'CI-refs/pull/1394/merge' exists
|
Start and stop the node
The operation was canceled.
|
All spec-tests passed
Process completed with exit code 1.
|