Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
Fix dual-channel replication test under valgrind (valkey-io#904)
Test dual-channel-replication primary gets cob overrun during replica rdb load` fails during the Valgrind run. This is due to the load handlers disconnecting before the tests complete, resulting in a low primary COB. Increasing the handlers' timeout should resolve this issue. Failure: https://github.com/valkey-io/valkey/actions/runs/10361286333/job/28681321393 Server logs reveals that the load handler clients were disconnected before the test started Also the two previus test took about 20 seconds which is the handler timeout. --------- Signed-off-by: naglera <[email protected]> Signed-off-by: Madelyn Olson <[email protected]> Co-authored-by: Madelyn Olson <[email protected]> Signed-off-by: mwish <[email protected]>
- Loading branch information