Changes utilities.py:to_cypher_value
to utilize double quotes when …
#1984
build-and-test.yml
on: pull_request
Matrix: build_and_test_ubuntu
Matrix: build_and_test_ubuntu_python3_11
Matrix: build_and_test_windows
Annotations
6 errors and 2 warnings
build_and_test_ubuntu_python3_11 (3.11, ubuntu-20.04)
Process completed with exit code 1.
|
build_and_test_ubuntu (3.9, ubuntu-20.04)
Process completed with exit code 1.
|
build_and_test_ubuntu (3.10, ubuntu-20.04)
The job was canceled because "_3_9_ubuntu-20_04" failed.
|
build_and_test_ubuntu (3.10, ubuntu-20.04)
The operation was canceled.
|
build_and_test_ubuntu (3.8, ubuntu-20.04)
The job was canceled because "_3_9_ubuntu-20_04" failed.
|
build_and_test_ubuntu (3.8, ubuntu-20.04)
The operation was canceled.
|
build_and_test_ubuntu_python3_11 (3.11, ubuntu-20.04)
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101
|
build_and_test_ubuntu (3.9, ubuntu-20.04)
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
assets-for-download
|
1.67 KB |
|