MODELIX-829 Split INode interface into multiple interfaces #3323
Triggered via pull request
February 3, 2025 11:35
Status
Failure
Total duration
1h 0m 28s
Artifacts
–
Annotations
6 errors
build-mps-components (2021.2)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 60 minutes.
|
build-mps-components (2021.2)
The operation was canceled.
|
build-mps-components (2022.2)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 60 minutes.
|
build-mps-components (2022.2)
The operation was canceled.
|
build-mps-components (2021.3)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 60 minutes.
|
build-mps-components (2021.3)
The operation was canceled.
|