Skip to content

Revise syncmap tests #21

Revise syncmap tests

Revise syncmap tests #21

Triggered via push November 14, 2024 07:57
Status Failure
Total duration 2m 42s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 1.
build (3.13)
The job was canceled because "_3_10" failed.
build (3.13)
The operation was canceled.
build (3.11)
The job was canceled because "_3_10" failed.
build (3.11)
The operation was canceled.