Skip to content

Rebuild poetry lock file #2

Rebuild poetry lock file

Rebuild poetry lock file #2

Triggered via push May 22, 2024 10:02
Status Failure
Total duration 47s
Billable time 7m
Artifacts

test.yml

on: push
Matrix: Tests
Notification
6s
Notification
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Lint
Process completed with exit code 1.
Tests (3.11)
Process completed with exit code 1.
Tests (3.10)
The job was canceled because "_3_11" failed.
Tests (3.9)
The job was canceled because "_3_11" failed.
Tests (3.10)
Process completed with exit code 1.
Tests (3.9)
Process completed with exit code 1.
Tests (3.12)
The job was canceled because "_3_11" failed.
Tests (3.12)
Process completed with exit code 1.
Tests (3.8)
The job was canceled because "_3_11" failed.
Tests (3.8)
The operation was canceled.