fix(deps): update all golang.org/x packages #24669
build-and-test.yml
on: pull_request
setup-environment
55s
govulncheck
1m 17s
Matrix: unittest-matrix
Matrix: cross-build-collector
unittest
0s
Annotations
17 errors
cross-build-collector (windows, 386)
Process completed with exit code 2.
|
cross-build-collector (linux, ppc64le)
Process completed with exit code 2.
|
cross-build-collector (linux, 386)
Process completed with exit code 2.
|
cross-build-collector (linux, amd64)
Process completed with exit code 2.
|
cross-build-collector (linux, arm, 7)
Process completed with exit code 2.
|
cross-build-collector (darwin, arm64)
Process completed with exit code 2.
|
cross-build-collector (windows, amd64)
Process completed with exit code 2.
|
cross-build-collector (darwin, amd64)
Process completed with exit code 2.
|
cross-build-collector (linux, arm64)
Process completed with exit code 2.
|
cross-build-collector (linux, s390x)
Process completed with exit code 2.
|
checks
Process completed with exit code 1.
|
test-coverage
Process completed with exit code 2.
|
unittest-matrix (ubuntu-latest, ~1.22)
Process completed with exit code 2.
|
unittest-matrix (ubuntu-latest, ~1.23)
The job was canceled because "ubuntu-latest__1_22" failed.
|
unittest-matrix (ubuntu-latest, ~1.23)
The operation was canceled.
|
unittest
Process completed with exit code 1.
|
lint
Process completed with exit code 2.
|