Skip to content

chore(deps): update babel monorepo #271

chore(deps): update babel monorepo

chore(deps): update babel monorepo #271

Triggered via pull request October 22, 2024 16:36
Status Failure
Total duration 5m 19s
Artifacts

ci.yml

on: pull_request
Matrix: Unit tests
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Linting
The job running on runner GitHub Actions 49 has exceeded the maximum execution time of 5 minutes.
Linting
The operation was canceled.
Unit tests (20)
The job running on runner GitHub Actions 41 has exceeded the maximum execution time of 5 minutes.
Unit tests (20)
The operation was canceled.
Building
The job running on runner GitHub Actions 50 has exceeded the maximum execution time of 5 minutes.
Building
The operation was canceled.
Unit tests (18)
The job running on runner GitHub Actions 53 has exceeded the maximum execution time of 5 minutes.
Unit tests (18)
The operation was canceled.