Skip to content

test

test #5

Triggered via pull request March 29, 2024 11:39
@parona-sourceparona-source
synchronize #1
ci_fix
Status Failure
Total duration 18s
Artifacts

ci.yml

on: pull_request
Matrix: linux
Fit to window
Zoom out
Zoom in

Annotations

9 errors
linux (3.11)
Process completed with exit code 100.
linux (3.12)
The job was canceled because "_3_11" failed.
linux (3.12)
Process completed with exit code 100.
linux (3.9)
The job was canceled because "_3_11" failed.
linux (3.10)
The job was canceled because "_3_11" failed.
linux (3.9)
Process completed with exit code 100.
linux (3.10)
Process completed with exit code 100.
linux (3.8)
The job was canceled because "_3_11" failed.
linux (3.8)
Process completed with exit code 100.