Skip to content

New command: outlook mailbox settings set. Closes #6208 #5782

New command: outlook mailbox settings set. Closes #6208

New command: outlook mailbox settings set. Closes #6208 #5782

Triggered via pull request January 6, 2025 11:31
Status Failure
Total duration 2m 31s
Artifacts 6

check_pr.yml

on: pull_request
Matrix: build
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 3 warnings
test (ubuntu-latest, 22, 20)
Process completed with exit code 2.
test (windows-latest, 20, 20)
The job was canceled because "ubuntu-latest_22_20" failed.
test (windows-latest, 20, 20)
The operation was canceled.
test (ubuntu-latest, 18, 20)
The job was canceled because "ubuntu-latest_22_20" failed.
test (ubuntu-latest, 18, 20)
The operation was canceled.
test (ubuntu-latest, 20, 20)
The job was canceled because "ubuntu-latest_22_20" failed.
test (ubuntu-latest, 20, 20)
The operation was canceled.
test (ubuntu-latest, 20, 20)
Process completed with exit code 2.
test (macos-latest, 20, 20)
The job was canceled because "ubuntu-latest_22_20" failed.
test (macos-latest, 20, 20)
The operation was canceled.
test (macos-latest, 20, 20)
Process completed with exit code 1.
build (ubuntu-latest, 20)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test_docs
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test (ubuntu-latest, 22, 20)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
build-macos-latest-20 Expired
40.3 MB
build-ubuntu-latest-20 Expired
40.4 MB
build-windows-latest-20 Expired
40.3 MB
coverage-macos-latest-20 Expired
149 Bytes
coverage-ubuntu-latest-20 Expired
165 Bytes
coverage-windows-latest-20 Expired
149 Bytes