Skip to content

fix(deps): update rust crate hyper to v1 #2288

fix(deps): update rust crate hyper to v1

fix(deps): update rust crate hyper to v1 #2288

Triggered via push December 18, 2023 17:09
Status Failure
Total duration 1m 37s
Artifacts

push-build.yml

on: push
fmt_clippy
34s
fmt_clippy
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

16 errors
fmt_clippy
Process completed with exit code 101.
build (x86_64-unknown-linux-musl, x86_64-backend, true)
Process completed with exit code 101.
build (aarch64-unknown-linux-musl, aarch64-backend, true)
The job was canceled because "x86_64-unknown-linux-mu_2" failed.
build (aarch64-unknown-linux-musl, aarch64-backend, true)
Process completed with exit code 101.
build (arm-unknown-linux-musleabihf, armv6l-backend, true)
The job was canceled because "x86_64-unknown-linux-mu_2" failed.
build (arm-unknown-linux-musleabihf, armv6l-backend, true)
Process completed with exit code 101.
build (armv7-unknown-linux-musleabihf, armv7l-backend, true)
The job was canceled because "x86_64-unknown-linux-mu_2" failed.
build (armv7-unknown-linux-musleabihf, armv7l-backend, true)
Process completed with exit code 101.
build (armv7-unknown-linux-musleabihf, armv7l, false)
The job was canceled because "x86_64-unknown-linux-mu_2" failed.
build (armv7-unknown-linux-musleabihf, armv7l, false)
The operation was canceled.
build (x86_64-unknown-linux-musl, x86_64, false)
The job was canceled because "x86_64-unknown-linux-mu_2" failed.
build (x86_64-unknown-linux-musl, x86_64, false)
The operation was canceled.
build (aarch64-unknown-linux-musl, aarch64, false)
The job was canceled because "x86_64-unknown-linux-mu_2" failed.
build (aarch64-unknown-linux-musl, aarch64, false)
The operation was canceled.
build (arm-unknown-linux-musleabihf, armv6l, false)
The job was canceled because "x86_64-unknown-linux-mu_2" failed.
build (arm-unknown-linux-musleabihf, armv6l, false)
The operation was canceled.