-
Notifications
You must be signed in to change notification settings - Fork 0
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
- Loading branch information
1 parent
ddbb99d
commit 418cd9b
Showing
4 changed files
with
177 additions
and
1 deletion.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,84 @@ | ||
--- GEOPHIRES v3 Input File | ||
--- Created on 2024-04-12 | ||
--- Investment Tax Credit (ITC) Example | ||
|
||
***Subsurface technical parameters*** | ||
************************************* | ||
Reservoir Model,1, ---Multiple Fractures reservoir model | ||
Reservoir Depth,5, ---[km] | ||
Number of Segments,1, ---[-] | ||
Gradient 1,55, ---[deg.C/km] | ||
Maximum Temperature,500, ---[deg.C] | ||
Number of Production Wells,2, ---[-] | ||
Number of Injection Wells,2, ---[-] | ||
Production Well Diameter,7, ---[inch] | ||
Injection Well Diameter,7, ---[inch] | ||
Ramey Production Wellbore Model,1, ---0 if disabled 1 if enabled | ||
Production Wellbore Temperature Drop,.5, ---[deg.C] | ||
Injection Wellbore Temperature Gain,0, ---[deg.C] | ||
Production Flow Rate per Well,55, ---[kg/s] | ||
Fracture Shape,3, ---[-] Should be 1 2 3 or 4. See manual for details | ||
Fracture Height,900, ---[m] | ||
Reservoir Volume Option,3, ---[-] Should be 1 2 3 or 4. See manual for details | ||
Number of Fractures,20, ---[-] | ||
Reservoir Volume,1000000000, ---[m^3] | ||
Water Loss Fraction,.02, ---[-] | ||
Productivity Index,5, ---[kg/s/bar] | ||
Injectivity Index,5, ---[kg/s/bar] | ||
Injection Temperature,50, ---[deg.C] | ||
Maximum Drawdown,1, ---[-] no redrilling considered | ||
Reservoir Heat Capacity,1000, ---[J/kg/K] | ||
Reservoir Density,2700, ---[kg/m^3] | ||
Reservoir Thermal Conductivity,2.7, ---[W/m/K] | ||
|
||
***SURFACE TECHNICAL PARAMETERS*** | ||
********************************** | ||
End-Use Option,1, ---[-] Electricity | ||
Power Plant Type,2, ---[-] Supercritical ORC | ||
Circulation Pump Efficiency,.8, ---[-] between .1 and 1 | ||
Utilization Factor,.9, ---[-] between .1 and 1 | ||
Surface Temperature,20, ---[deg.C] | ||
Ambient Temperature,20, ---[deg.C] | ||
|
||
***CAPITAL AND O&M COST PARAMETERS*** | ||
************************************* | ||
Well Drilling and Completion Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Well Drilling Cost Correlation,1, ---[-] Use built-in correlations | ||
Reservoir Stimulation Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Surface Plant Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Field Gathering System Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Exploration Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Wellfield O&M Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Surface Plant O&M Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Water Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
|
||
|
||
*** Economic/Financial Parameters *** | ||
************************************* | ||
Plant Lifetime,30, --- [years] | ||
Economic Model,3, --- Should be 1 (FCR model) 2 (Standard LCOE/LCOH model) or 3 (Bicycle model). | ||
Fraction of Investment in Bonds,0.65, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Inflated Bond Interest Rate,0.07, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Inflated Equity Interest Rate,0.12, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Inflation Rate,0.025, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Combined Income Tax Rate,0.392, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Gross Revenue Tax Rate,0, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Investment Tax Credit Rate,0, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Property Tax Rate,0, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Inflation Rate During Construction,0, --- [-] | ||
Well Drilling and Completion Capital Cost Adjustment Factor,1, --- [-] Use built-in well cost correlation as is | ||
Well Drilling Cost Correlation,1, --- [-] Use built-in well drilling cost correlation #1 | ||
Reservoir Stimulation Capital Cost,0, --- [M$/injection well] Reservoir stimulation capital cost per injection well | ||
Surface Plant Capital Cost Adjustment Factor,1, --- [-] Use built-in surface plant cost correlation as is | ||
Field Gathering System Capital Cost Adjustment Factor,1, --- [-] Use built-in pipeline distribution cost correlation as is | ||
Exploration Capital Cost Adjustment Factor,1, --- [-] Use built-in exploration cost correlation as is | ||
Wellfield O&M Cost Adjustment Factor,1, --- [-] Use built-in wellfield O&M cost correlation as is | ||
Water Cost Adjustment Factor,1, --- [-] Use built-in water cost correlation as is | ||
Surface Plant O&M Cost Adjustment Factor,1, --- [-] Use built-in surface plant O&M cost correlation as is | ||
Investment Tax Credit Rate,0.5, --- [-] Investment tax credit rate | ||
|
||
***Simulation Parameters*** | ||
*************************** | ||
|
||
Print Output to Console,1, ---[-] Should be 0 (don't print results) or 1 (print results) | ||
Time steps per year,6, ---[1/year] |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,88 @@ | ||
--- GEOPHIRES v3 Input File | ||
--- Created on 2024-04-12 | ||
--- Production Tax Credit (PTC) Example | ||
|
||
***Subsurface technical parameters*** | ||
************************************* | ||
Reservoir Model,1, ---Multiple Fractures reservoir model | ||
Reservoir Depth,5, ---[km] | ||
Number of Segments,1, ---[-] | ||
Gradient 1,55, ---[deg.C/km] | ||
Maximum Temperature,500, ---[deg.C] | ||
Number of Production Wells,2, ---[-] | ||
Number of Injection Wells,2, ---[-] | ||
Production Well Diameter,7, ---[inch] | ||
Injection Well Diameter,7, ---[inch] | ||
Ramey Production Wellbore Model,1, ---0 if disabled 1 if enabled | ||
Production Wellbore Temperature Drop,.5, ---[deg.C] | ||
Injection Wellbore Temperature Gain,0, ---[deg.C] | ||
Production Flow Rate per Well,55, ---[kg/s] | ||
Fracture Shape,3, ---[-] Should be 1 2 3 or 4. See manual for details | ||
Fracture Height,900, ---[m] | ||
Reservoir Volume Option,3, ---[-] Should be 1 2 3 or 4. See manual for details | ||
Number of Fractures,20, ---[-] | ||
Reservoir Volume,1000000000, ---[m^3] | ||
Water Loss Fraction,.02, ---[-] | ||
Productivity Index,5, ---[kg/s/bar] | ||
Injectivity Index,5, ---[kg/s/bar] | ||
Injection Temperature,50, ---[deg.C] | ||
Maximum Drawdown,1, ---[-] no redrilling considered | ||
Reservoir Heat Capacity,1000, ---[J/kg/K] | ||
Reservoir Density,2700, ---[kg/m^3] | ||
Reservoir Thermal Conductivity,2.7, ---[W/m/K] | ||
|
||
***SURFACE TECHNICAL PARAMETERS*** | ||
********************************** | ||
End-Use Option,1, ---[-] Electricity | ||
Power Plant Type,2, ---[-] Supercritical ORC | ||
Circulation Pump Efficiency,.8, ---[-] between .1 and 1 | ||
Utilization Factor,.9, ---[-] between .1 and 1 | ||
Surface Temperature,20, ---[deg.C] | ||
Ambient Temperature,20, ---[deg.C] | ||
|
||
***CAPITAL AND O&M COST PARAMETERS*** | ||
************************************* | ||
Well Drilling and Completion Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Well Drilling Cost Correlation,1, ---[-] Use built-in correlations | ||
Reservoir Stimulation Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Surface Plant Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Field Gathering System Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Exploration Capital Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Wellfield O&M Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Surface Plant O&M Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
Water Cost Adjustment Factor,1, ---[-] Use built-in correlations | ||
|
||
|
||
*** Economic/Financial Parameters *** | ||
************************************* | ||
Plant Lifetime,30, --- [years] | ||
Economic Model,3, --- Should be 1 (FCR model) 2 (Standard LCOE/LCOH model) or 3 (Bicycle model). | ||
Fraction of Investment in Bonds,0.65, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Inflated Bond Interest Rate,0.07, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Inflated Equity Interest Rate,0.12, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Inflation Rate,0.025, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Combined Income Tax Rate,0.392, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Gross Revenue Tax Rate,0, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Investment Tax Credit Rate,0, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Property Tax Rate,0, --- [-] Required if Bicycle model is selected. See manual for details. | ||
Inflation Rate During Construction,0, --- [-] | ||
Well Drilling and Completion Capital Cost Adjustment Factor,1, --- [-] Use built-in well cost correlation as is | ||
Well Drilling Cost Correlation,1, --- [-] Use built-in well drilling cost correlation #1 | ||
Reservoir Stimulation Capital Cost,0, --- [M$/injection well] Reservoir stimulation capital cost per injection well | ||
Surface Plant Capital Cost Adjustment Factor,1, --- [-] Use built-in surface plant cost correlation as is | ||
Field Gathering System Capital Cost Adjustment Factor,1, --- [-] Use built-in pipeline distribution cost correlation as is | ||
Exploration Capital Cost Adjustment Factor,1, --- [-] Use built-in exploration cost correlation as is | ||
Wellfield O&M Cost Adjustment Factor,1, --- [-] Use built-in wellfield O&M cost correlation as is | ||
Water Cost Adjustment Factor,1, --- [-] Use built-in water cost correlation as is | ||
Surface Plant O&M Cost Adjustment Factor,1, --- [-] Use built-in surface plant O&M cost correlation as is | ||
Production Tax Credit Electricity, 0.05, --- [-] Production tax credit for electricity in $/kWh | ||
Production Tax Credit Heat, 0.05, --- [-] Production tax credit for electricity in $/kWh | ||
Production Tax Credit Cooling, 0.05, --- [-] Production tax credit for electricity in $/kWh | ||
Production Tax Credit Duration, 10, --- [-] Production tax credit for duration in years | ||
Production Tax Credit Inflation Adjusted, True, --- [-] Is the Production tax credit inflation adjusted (T/F) | ||
|
||
***Simulation Parameters*** | ||
*************************** | ||
|
||
Print Output to Console,1, ---[-] Should be 0 (don't print results) or 1 (print results) | ||
Time steps per year,6, ---[1/year] |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters