Skip to content

Commit

Permalink
Adding documentation for GTS-to-WIS2 Gateway tests (#72)
Browse files Browse the repository at this point in the history
New section to be added into the Global Services testing document.

Signed-off-by: Jeremy Tandy <[email protected]>
  • Loading branch information
6a6d74 authored Dec 18, 2024
1 parent af722bb commit c8b48fd
Showing 1 changed file with 17 additions and 0 deletions.
17 changes: 17 additions & 0 deletions global-services-testing/sections/testing/gts-to-wis2-gateway.adoc
Original file line number Diff line number Diff line change
@@ -0,0 +1,17 @@
[[gts-to-wis2-gateway-testing]]

=== GTS-to-WIS2 Gateway testing

No formal (e.g., automated) testing is required for the GTS-to-WIS2 Gateway.

Each WIS Centre seeking to decommission its GTS Message Switch must check that all the bulletins they normally receive via GTS are available from at least one GTS-to-WIS2 Gateway.

Each GISC should work with RTHs to validate that everything their affiliated centres are producing on GTS are available from each Gateway.

[sidebar]
The assessment of the GTS bulletins being pubished via the GTS-to-WIS2 Gateways should be completed between 1-Jan-2025 and 31-Mar-2025.

In summary, we propose to use “user” feedback to determine veracity and completeness of data published by each Gateway.

Performance testing is not required because each GTS-to-WIS2 Gateway has already demonstrated sustained throughput of bulletins to messages and data from GTS into WIS2.

0 comments on commit c8b48fd

Please sign in to comment.