Skip to content

TOPIC: preliminary refactoring in ydb tools dump code #33081

TOPIC: preliminary refactoring in ydb tools dump code

TOPIC: preliminary refactoring in ydb tools dump code #33081

Triggered via pull request January 31, 2025 06:56
@jepett0jepett0
opened #14052
Status Failure
Total duration 17m 39s
Artifacts

pr_check.yml

on: pull_request_target
check-running-allowed
3s
check-running-allowed
Matrix: build_and_test
update_integrated_status
1s
update_integrated_status
Fit to window
Zoom out
Zoom in

Annotations

15 errors and 2 warnings
Build and test relwithdebinfo
Process completed with exit code 16.
Build and test relwithdebinfo
Process completed with exit code 2.
Build and test relwithdebinfo
Process completed with exit code 1.
Build and test relwithdebinfo
Process completed with exit code 1.
Build and test relwithdebinfo
Process completed with exit code 1.
Build and test release-asan
unable to access 'https://github.com/ydb-platform/ydb/': GnuTLS recv error (-110): The TLS connection was non-properly terminated.
Build and test release-asan
RPC failed; curl 92 HTTP/2 stream 0 was not closed cleanly: CANCEL (err 8)
Build and test release-asan
6822 bytes of body are still expected
Build and test release-asan
early EOF
Build and test release-asan
fetch-pack: invalid index-pack output
Build and test release-asan
RPC failed; curl 56 GnuTLS recv error (-54): Error in the pull function.
Build and test release-asan
6833 bytes of body are still expected
Build and test release-asan
early EOF
Build and test release-asan
fetch-pack: invalid index-pack output
Build and test release-asan
The process '/usr/bin/git' failed with exit code 128
Build and test relwithdebinfo
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/11bd71901bbe5b1630ceea73d27597364c9af683'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Build and test relwithdebinfo
Back off 16.238 seconds before retry.