Skip to content

April 2019 Morning Status Meetings

sblondel edited this page Apr 24, 2019 · 16 revisions

This page contains a brief summary of the status of the Xolotl development team each morning during the month of April 2019.

20190401

Sophie - Converting the He ITER data to HeDT data and starting pre-implented simulations.

20190402

Sophie - Continuing to work on the pre-implented simulations and the stuck cases in ITER.

20190403

Sophie - Starting the pre-implented simulations. Looking at what could cause the asymmetry in MOOSE coupling.

20190405

Sophie - Looking at the first results from the pre-implanted simulations. Running Dong-Uk case of residual Xe rate in Xolotl-MOOSE coupling.

20190408

Sophie - Analyzing the data from the Dong-Uk case of residual Xe rate in Xolotl-MOOSE coupling. Checking results from the 800H branch.

20190409

Sophie - Looking at the strange behavior of void diameters from the 800H branch. Continuing on the residual Xe rate in Xolotl-MOOSE coupling.

20190410

Sophie - Continuing to investigate the residual Xe rate in Xolotl-MOOSE coupling. Analyzing the data from ITER pre-implanted cases.

20190412

Sophie - Looking at phase space data for IPS runs. Preparing for meeting with PETSc people.

20190415

Sophie - Preparing slides on Xolotl MOOSE coupling. Checking on IPS runs data.

20190417

Sophie - Adding desorption and bursting tracking to PSI case. Testing uniform grid with heat equation.

20190422

Sophie - Updating the bursting model with hard cut-off depth and minimum helium size. Looking at the NE Booth model.

20190423

Sophie - Starting to compare pre-implanted data to pure tungsten. Continuing to work on the bursting model and data to save (desorption).

20190424

Sophie - Setting up the Booth model case. Continuing to work on saving the surface desorption.

Clone this wiki locally