-
Notifications
You must be signed in to change notification settings - Fork 21
December 2019 Morning Status Meetings
This page contains a brief summary of the status of the Xolotl development team each morning during the month of December 2019.
Sophie - Analyzing the dynamic branch data. Working on connectivity in the plsm branch.
Sophie - Continuing to work on connectivity in plsm branch. Investigating 3D NE issues.
Sophie - Continuing to work on connectivity in plsm branch and the 3D NE issues.
Sophie - Adding reactions to the plsm branch. Testing the set-up for pulsed cases.
Sophie - Continuing to test the set-up for pulsed cases. Working on the 3D NE case.
Sophie - Working on the 3D NE case. Adding special cases for I reactions in plsm network.
Sophie - Continuing on cases with I in plsm network. Plotting the results from the heat flux study with new parameters.
Sophie - Continuing on cases with I in plsm network for coefs. Looking at T diffusion for ITER simulations.
Sophie - Continuing to study the T diffusion for ITER simulations. Profile 3D NE with Valgrind.
Sophie - Building plsm on Iguazu to test different compilers. Starting 3D coupled code simulations.
Sophie - Continuing to test 3D NE simulation (both coupling and stand alone profiling). Generating input files for He keV case.
Sophie - Trying to fix the the composition initialization issue with clang in the plsm branch. Adding a He desorption monitor option.