Skip to content

January 2021 Morning Status Meetings

sblondel edited this page Jan 22, 2021 · 12 revisions

This page contains a brief summary of the status of the Xolotl development team each morning during the month of January 2021.

20210104

Sophie - Checking on the dynamic grid simulations.

20210105

Sophie - Working on Soret effect and NE coupling paper.

20210106

Sophie - Continuing on the Soret effect, hpctoolkit with NE transfer simulations.

20210108

Sophie - Continuing on the Soret effect and working on the PSI poster.

20210111

Sophie - Working on the NE paper and PSI poster.

20210112

Sophie - Finishing the PSI poster and working on the Soret effect.

20210113

Sophie - Continuing on the Soret implementation and recording for PSI poster.

20210115

Sophie - Continuing on the Soret implementation and checking the UQ installation on Cori.

20210119

Sophie - Continuing on the Soret implementation (mix material) and transfer time in the NE coupled code.

20210120

Sophie - Continuing on the Soret implementation (mix material) and mesh PID in NE coupling code.

20210122

Sophie - Continuing on the Soret implementation of mix material, and profiling of transfer time in NE.

Clone this wiki locally