February 2019 Morning Status Meetings

sblondel edited this page Feb 27, 2019 · 13 revisions

This page contains a brief summary of the status of the Xolotl development team each morning during the month of February 2019.

20190201

Sophie - Trying the free GB with oblique geometry again.

20190204

Sophie - Writing a script to plot the temperature map in 2D.

20190211

Sophie - Checking the temperature evolution in 2D and looking at the stuck locations from the ITER runs.

20190212

Sophie - Working on the coupling between Xolotl and MARMOT.

20190213

Sophie - Fixing the flux to the free surface GB. Looking at hydrogen desorption.

20190215

Sophie - Implementing the hydrogen desorption. Testing the coupling between phase field and Xolotl.

20190218

Sophie - Continuing to test the coupling between phase field and Xolotl. Looking at locations with long times in the ITER runs.

20190219

Sophie - Continuing to implement the hydrogen desorption.

20190220

Sophie - Looking at the status of each ITER location from IPS. Finishing to implement the hydrogen desorption.

20190222

Sophie - Checking the performance of 2D PETSc options on 1D heat flux. Investigating the double initialization in the NE coupling.

20190225

Sophie - Extending the PetscDMDAMesh to 3D for coupling with MOOSE.

20190226

Sophie - Testing the PetscDMDAMesh to 3D for coupling with MOOSE.

20190227

Sophie - Starting to read the GB location from MOOSE for Xolotl. Testing He-H grouping with and without moments.