Skip to content

October 2020 Morning Status Meetings

sblondel edited this page Oct 30, 2020 · 16 revisions

This page contains a brief summary of the status of the Xolotl development team each morning during the month of October 2020.

20201002

Sophie - Rerunning the HeV diffusivity simulations and testing limited diffusion on it. Continuing on the geometric gradation grid.

20201005

Sophie - Continuing on the HeV diffusivity simulations and running 3D NE coupling simulations to look at data transfer time.

20201006

Sophie - Working on HeDTV grouping. Continuing on the geometric gradation grid.

20201007

Sophie - Continuing on HeDTV grouping. Adding solver tests in plsm branch.

20201009

Sophie - Trying to run HeDTV simulations on summit. Checking simulations on Cori.

20201013

Sophie - Starting new dynamic grid simulations on Cori. Working on the grouping for HeV only.

20201014

Sophie - Adding printing information in the plsm branch, testing 3D NE coupling with grain tracker.

20201016

Sophie - Continuing on the factory printing, preparing slides for Xolotl presentation.

20201019

Sophie - Installing plsm branch at ANL and looking at the differences in HeV grouping.

20201020

Sophie - Continuing to install plsm branch at ANL and analyzing the dynamic grid data.

20201021

Sophie - Continuing to test geometric gradation grids.

20201023

Sophie - Thinking of non dilute effects on helium and continuing to time geometric gradation grid simulations.

20201026

Sophie - Installing plsm branch on Cori and starting standard HeV diffusion simulations on Summit.

20201027

Sophie - Trying the vizu at INL and working on TSEventHandler.

20201028

Sophie - Cleaning up the code coupling builds at INL, continuing on the visualization. Starting HeTVI simulations for ITER.

20201030

Sophie - Writing documentation for visu at INL. Running more geometric gradation grid simulations.

Clone this wiki locally