-
Notifications
You must be signed in to change notification settings - Fork 21
November 2020 Morning Status Meetings
This page contains a brief summary of the status of the Xolotl development team each morning during the month of November 2020.
Sophie - Continuing on geometric gradation grid and reduced matrix method.
Sophie - Same as yesterday.
Sophie - Working on bursting craters and NE coupling with Grain Tracker.
Sophie - Continuing on craters and reduced matrix method.
Sophie - Working on NE transfer timing and remote visualization.
Sophie - Continuing on NE transfer timing and geometric gradation grid.
Sophie - Continuing on the crater bursting and test reduced matrix method on Summit.
Sophie - Working on segfault of NE coupling code with many nodes and dynamic grid test cases.
Sophie - Updating documentation in the plsm branch and working on bursting craters.
Sophie - Continuing to update documentation and studying NE transfer time scaling.
Sophie - Working on crater bursting and simulations on Summit.
Sophie - Continuing to cleanup the plsm branch and running crater simulations.
Sophie - Checking VTK-m and the plsm-network branch. Continuing to clean the code.
Sophie - Cleaning the visualization and testing the geometric gradation grid on simple cases.