-
Notifications
You must be signed in to change notification settings - Fork 21
March 2015 Morning Status Meetings
This page contains a brief summary of the status of the Xolotl development team each morning during the month of March 2015.
Sophie - Testing the new modified trap-mutation handler in the irregular grid branch.
Sophie - Cleaning-up xolotlCore and the associated tests. Looking at enforcing a minimum version for MPI.
Sophie - Looking at enforcing a minimum version for MPI. Running simulations using the modified trap-mutation handler. Looking at recent changes in the petscsolver branch.
Sophie - Checking that the reactant methods are optimized in xolotlCore. Presenting Massif at the PSI telecon.
Sophie - Looking at the formation energy fit currently used in the preprocessor and how it extends to bigger networks. Updating the petsc solver branch with the latest changes form the trunk and switching the != 0.0 condition to a condition using xolotlCore::equal().
Sophie - Updating the petsc solver branch with the latest changes form the trunk and switching the != 0.0 condition to a condition using xolotlCore::equal(). Running some 2D cases.
Sophie - Running more 2D cases with the helium flux only on one part of the material. Merging the latest changes from the petscsolver branch back to the trunk.
Sophie - Looking at the influence of the lattice parameter of the retention and running more 2D cases with the helium flux only on one part of the material.
Sophie - Running 2D cases with the helium flux only on one part of the material and a flux profile. Updating the moving surface branch with the latest changes from the trunk.
Sophie - Finishing updating the moving surface branch with the latest changes from the trunk and testing it.
Sophie - Reading about dual-phase. Cleaning-up the tests. Running 2D cases with the helium flux only on one part of the material and a moving surface.
Sophie - Updating PETSc and Xolotl on Titan. Running some big runs to test it.
Sophie - Finishing to update PETSc and Xolotl on Titan. Running some big runs to test it. Working on the presentation for the QUEST meeting.
Sophie - Testing the installation on Titan. Looking at interface conditions for the front tracking.
Sophie - Trying to understand why Xolotl doesn't work on Eos. Continuing on the interface conditions for the front tracking.
Sophie - Finishing the QUEST presentation. Writing to Danqing about Eos. Continuing on the interface conditions for the front tracking.
Sophie - Interviewing Sarah. Getting ready for the Quest meeting. Continuing on the interface conditions for the front tracking.
Sophie - Finishing the Quest presentation, leaving for the Quest meeting.